Recent Projects

 

Awatoto, Napier

Ravensdown Fertiliser Co-operative Limited ("RFC") owns and operates a major fertiliser manufacturing plant at Awatoto, Napier (the Awatoto Plant). It provides up to 560,000 tonnes of superphosphate annually.
Glasson Potts Fowler have assisted at the Awatoto site with:

 

Air Discharge
• Manage preparation of consent
• Co-ordinate consent process
• Assist with co-ordination and undertaking of consultation
• Prepare various management and report plans
• Develop a response reaction process

 

Storm Water
• Prepare and manage resource consent
• Undertake consultation

 

Hatuma Foods Limited

GPF have been providing assistance with setting up a vegetable processing facility in Waipukarau. GPF are involved specifically with assistance towards gaining consent to create an industrial subdivision where the processing factory is to be located. Negotiations and connection to Council sewer and water supply are also part of this project. Design of the drainage system and access road for the site are also currently undertaken by GPF with the goal that the site be fully developed later this year.

 

Ascot Park – Kirwee

This rural-residential development involved providing design, planning, engineering and surveying services for this 59 lot subdivision. Thirty-nine lots have been developed with the balance expected to be available late in 2005.

 

Port Nelson Limited: Main Wharf South Extension & Noise Variation

Full environmental investigations, comprehensive consultation process, and preparation of resource consent applications for the extension of the Main Wharf South at Port Nelson involving the extension of the wharf and an adjacent reclamation. An additional segment of the project involved the consultation for and preparation of a variation to the Nelson Resource Management Plan so that Port Nelson can operate within adequate but practical noise limits.

 

Worsley Farm Ltd, Cashmere

Stormwater runoff modelling assessment, consenting and design of stormwater attenuation basins and first flush basins. Floodplain assessment and effects assessment of filling and compensatory storage. Design of a detailed construction stage silt management plan.