Environmental Engineering and Science

GPF Science and Engineering Section integrates well with the Resource
Management Planning and Property Development Sections within the
company enabling clients to reap the full benefits of engaging
GPF. However, we do call on outside assistance where required,
as well as for peer review. This leads to cost effective and timely
conductance of projects and gaining of consents.
The Engineering and Science team currently consists of four Engineers,
an Agricultural Scientist, a Soil Scientist, two Hydrogeologists,
an Air Quality Specialist, two Biotechnologists and a Planner/Engineer
specialising in stormwater and dealing with local authorities.
Other engineers and drafting are also available to our team in
the Property Development Section as required.
We undertake all of the following:
Resource Consent Applications
- Land use consents
- Water Permits
- Discharge Permits
- Expert Evidence
Environmental Impact Assessments
- Feasibility studies
- Scoping of AEEs
- Site selection studies and consultation
Water Supply
- Water resources assessments
- Option assessments and feasibility studies
- Groundwater and surfacewater modelling
- Water treatment design
Irrigation
- Crop water and soil water requirements
- Irrigation system design and optimisation
- Scheme design and optimisation
- Detailed design and supervision
Wastewater
- Wastewater characterisation
- On-site treatment system design
- Community treatment system
- Industrial wastewater treatment
- Options assessment and contaminant modelling
- Stormwater treatment and disposal
Land Treatment of Wastes
- Assessment of land suitability
- Detailed soils assessment and revenue option assessment
- Land treatment system design and supervision
- Soil nutrient and groundwater plume modelling
Contaminated Site Investigations
- Site investigation methodology
- Detailed site investigations
- Site remediation design and supervision
Air Quality Assessment
- Resource consent applications for discharges to air
- Assessment of environmental effects
- Air pollution control systems options assessment
Monitoring
- Design and implementation of appropriate monitoring regimes
- Interpretation of environmental monitoring results
- District and Regional Plan and Resource consent monitoring
Environmental Auditing
- Site assessments and compliance reviews
- Due diligence and consent audits
- Environmental risk assessment and best practice
Trade Wastes
- Waste stream characterisation
- Treatment options assessment
- System design and Waste minimisation
- Detailed design and supervision
Selected Project Profiles:
Awatoto,
Napier
Ravensdown
Fertiliser Co-operative Limited ("RFC") owns and
operates a major fertiliser manufacturing plant at Awatoto, Napier
(the Awatoto Plant). It provides up to 560,000 tonnes of superphosphate
annually.
Glasson Potts Fowler have assisted at the Awatoto site with:
Air Discharge
• Manage preparation of consent
• Co-ordinate consent process
• Assist with co-ordination and undertaking of consultation
• Prepare various management and report plans
• Develop a response reaction process
Storm Water
• Prepare and manage resource consent
• Undertake consultation
Hatuma Foods Limited
GPF have been providing assistance with setting up a vegetable
processing facility in Waipukarau. GPF are involved specifically
with assistance towards gaining consent to create an industrial
subdivision where the processing factory is to be located. Negotiations
and connection to Council sewer and water supply are also part
of this project. Design of the drainage system and access road
for the site are also currently undertaken by GPF with the goal
that the site be fully developed later this year.
Meridian Energy Ltd, Project Aqua
Irrigation scoping study to assess the potential for irrigation
in North Otago. Assessment of mitigation measures for the existing
irrigation schemes in North Otago for effects during and post
construction of the proposed Project Aqua 60 km canal in the
Lower Waitaki Valley.
Worsley Farm Ltd, Cashmere
Stormwater runoff modelling assessment, consenting and design of
stormwater attenuation basins and first flush basins. Floodplain
assessment and effects assessment of filling and compensatory storage.
Design of a detailed construction stage silt management plan.
Allied Concrete Ltd, Nationally
Design of site wastewater and stormwater treatment and recycling
systems for existing and proposed plants in Christchurch, Ashburton,
Dunedin, Rangiora, Wellington, Whangarei. Projects included discharges
to both land and water as well as air discharges.
Ellerm Norton Ltd, Lake Brunner
Reticulation and sewage treatment design incorporating wetland
treatment and MEDS reticulation for a tourist development and subdivision
at Lake Brunner. Subsequent detailed design and construction supervision.
The project was the first design of a wetland treatment system
on the West Coast.
Richmond Ltd, Oringi
Consents audit and resource consent applications including Assessment
of Environmental Effects for all existing activities for a large
meatworks, processing 1.9M stock units per annum. Project included
on-going monitoring and identification of alternative wastewater
treatment options, management plan, and on-site staff environmental
training.
Selwyn District Council, Lake Coleridge
Assessment of options
for sewage treatment for a small community. Consultation with
the Community and iwi. Assessment of effects
for land based sewage treatment discharge and successful
resource consent application. Detailed design and documentation
of upgrade
to primary treatment, a new wetland system, overland flow
system and denitrification trench system.
|